S.No. Subject Letter No. Download
1. PROCUREMENT OF MATERIALS FOR DG MAP WORKS 04/2008

2. USE OF COMPOSITE PIPE IN PLUMBING SYSTEM 30/2008

3. FLOOR AND WALL CERAMIC TILES 03/2008

4. CONCRETING IN HOT WEATHER FOR MAP WORKS 02/2008

5. PLY BOARD / BLOCK BOARD, PRE - LAMINATED PARTICLE BOARD, PLAIN / VENEERED PARTICLE BOARD FOR MAP WORKS 01/2008

6. USE OF FLUSH DOOR IN MAP 05/2008

7. CP BRASS BATHROOM FITTINGS AND OTHER ACCESSORIES
FOR MAP WORKS
Policy letter No 16/2007

8. HDPE (ROTATIONAL MOULDED) STORAGE TANKS FOR MAP WORKS 10        Jul 2008

9. USE OF VENTILATING PIPES IN MAP 15 Jul 2008

10. PROVISION OF SEWAGE TREATMENT PLANTS (STPs) IN MAP 01Aug 2008

11.
PROVISION OF TAMPER PROOF ELECTRONIC METER
14Aug  2008

12. AMMENDMENT TO POLICY LETTER NO 04 / 2007 : PROVISION OF SEWAGE TREATMENT PLANTS IN MAP 04/2007
13. USE OF WATER PROOFING TREATMENT IN MAP WORKS 08/2008
14. WATER STORAGE TANKS FOR MAP WORKS 11/2008
15. USE OF ALUMINIUM DOORS AND WINDOWS IN MAP WORKS 22/2007
16. APPROVAL OF LUMINARIES, SWITCH / SOCKET, CALL BELL AND MISC ELECTRICAL IEMS FOR MAP WORKS 17/2008
17. CP BRASS BATHROOM FITTINGS AND OTHER ACCESSORIES FOR MAP WORKS 20/2008
18 . USE OF ANTI-THEFT MAIN DOOR IN DG MAP 23/2008
19. USE OF POLYETHYLENE PIPES IN MAP 26/2008
20 . USE OF DUCTILE IRON PIPES IN MAP WORKS 29/2008
21 . AMENDMENT TO POLICY ON GUIDELINES FOR USE, FORMULATING SPECIFICATIONS AND SOURCING OF STEEL FOR MAP WORKS 07/2007
22 . PVC CABLES, HT XLPE, LT, DOMESTIC, TELEPHONE WIRE AND TV CABLE FOR MAP WORKS 06/2008
23. USE OF PRECAST TERRAZZO TILES / PAVING BLOCKS / CHEQUERED CEMENT CONCRETE TILES / PCC TILES AND PCC KERB IN MAP WORKS 09/2008
24 . USE OF DRY DISTEMPER FOR MAP WORKS 12/2008
25. APPROVAL OF PVC WINDOW FOR MAP 15/2008
26. GI PIPES & FITTINGS / uPVC PIPES & FITTINGS / STEEL TUBULAR POLES / CENTRIFUGALLY CAST CI SOIL WASTE, VENT PIPES AND FITTINGS FOR MAP WORKS 18/2008
27. VITREOUS CHINA SANITARY WARE, PVC FLUSHING CISTERN AND PLASTIC SEAT AND COVER (SOLID HEAVY DUTY) / BRASS BALL COCK (FLOAT VALVE), COCKROACH TRAP AND GM FERRULE / ANTI TERMITE TREATMENT FOR MAP WORKS 21/2008
28. PROCUREMENT OF CP BRASS BATHROOM FITTINGS AND OTHER ACCESSORIES FOR MAP WORKS 24/2008
29. USE OF PVC CONDUIT PIPE & FITTINGS IN MAP 27/2008
30. AMENDMENT TO POLICY ON GUIDELINES FOR USE, FORMULATING SPECIFICATIONS AND SOURCING OF STEEL FOR MAP WORKS 07/2007
31. USE OF FACTORY MADE GLAZED/FLYPROOF/WIRE GAUZED DOOR SHUTTER IN MAP WORKS 07/2008
32. USE OF STEEL SECTION WINDOW / VENTS / GRILLS GUARD BARS AND PRESSED STEEL FRAMES IN MAP WORKS 10/2008
33. KITCHEN SINK STAINLESS STEEL FOR MAP WORKS 13/2008
34. USE OF PAINTS FOR MAP WORKS 16/2008
35. CEILING FANS / EXHAUST FANS / VENTILATION FANS AND GEYSERS FOR MAP WORKS 19/2008
36. ELECTRICAL LOADS IN RESPECT OF DUs: MAP ACCN 22/2008
37. USE OF COMPOSITE PIPES IN PLUMBING SYSTEM 25/2008
38. USE OF CEMENT IN MAP : MANUFACTURERS 28/2008
39. STANDARDISATION IN MAP WORKS
21315/Policy/P&S/ 67 /MAP
21/11/2008
40. PROVISION OF CURTAIN RODS IN MAP 23/12/2008
41. STANDARDISATION IN MAP WORKS
21315/Policy/P&S/ 63 /MAP
1/10/2008
42. STANDARDISATION IN MAP WORKS
21315/Policy/P&S/65/MAP
4/11/2008
43. TRANSFORMERS FOR MAP WORKS 27/11/2008